Parkway Elementary

Client: Parkway Elementary School

Project Size: 49,000 Sq. Ft.

This project consisted of a new Duro-Last PVC roof system installed over a mechanically fastened polyiso insulation board over a steel deck. The roof system was designed with multiple stacks, roof drains and HVAC units. We installed all custom fabricated accessories on this entire roof. All HVAC units has new walk pads installed around them to protect the existing roof membrane from damage. Custom 2 piece compression metal is installed as well as new gutters and downspouts on the entire roof area.

This roof system will offer many years of service to the school and is a low maintenance product that is energy efficient and will save the parish thousands of dollars through the years in electricity cost.